Jimmi McJenkins
Sometimes miracles
I have worked in construction for over 6 years now and usually when you have a project ahead of schedule it's because the work force is doing an amazing job not the other way around. There are so many variables to this that you are ignoring it's unbelievable. Scheduling is scheduling. I have been on jobs where it was a joke that could never be kept up with and some where it was incredibly realistic. I could care less if you like the project or pcl or whatever but the men who are actually putting the work in are doing a hell of a job and deserve praise.
So much this.