Just got to tour the construction site. Reposting this from the NYI board:
This is the Eastern side of the building. The main entrance is to the right on the NE corner. The big glass windows are a restaurant that will be open to the public. The liquor license to the building extends all the way to the green construction fences (not pictured) allowing them to sell alcohol outside of the building in the courtyards:
The main entrance. Escalator install is in progress.
The main concourse after coming up the stairs from the entrance. Escalators to the 200s and 300s are on the left as well as the team store. The main concourse is massive:
Bar area overlooking the 100s from the main concourse:
From the top row of the 100s. Scoreboard is being assembled at center ice and the seat install is in progress:
The indoor/outdoor bar overlooking the grand stand:
The view from the back of the 200s. The 200s are 5 rows that sit above the suites. The 300s are above with 10-12 rows of seats. The seats have a ton of padding and look really comfortable:
CUPHOLDERS!!!!!!
Upper 200s/300s concourse: